Nameplate capacity
3.0 MW
Rank in Virginia
#225
of 261 plants
In service since
2023
February 2023
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Madison Energy Investments LLC
- County
- Wise County
- Generating units
- 1
- Share of state capacity
- 0.01%
- Rank among solar plants in Virginia
- #125 of 142
- EIA plant code
- 67463
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| MGPV1 | Solar Photovoltaic | 3.0 MW | 3.0 MW | 2023 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Virginia
| Elam Road Solar, LLC | Solar | 3.0 MW |
| HCE Moran Solar, LLC | Solar | 3.0 MW |
| NL VA - Dry Fork | Solar | 3.0 MW |
| Sandale Solar, LLC | Solar | 3.0 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 3.0 MW solar plant and a 3.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.