Nameplate capacity
1.9 MW
Rank in Utah
#117
of 131 plants
In service since
1958
August 1958
Details
- Primary fuel
- Hydro
- Technology
- Conventional Hydroelectric
- Operator
- Weber Basin Water Conserv Dist
- County
- Summit County
- Generating units
- 1
- Share of state capacity
- 0.02%
- Rank among hydro plants in Utah
- #18 of 29
- EIA plant code
- 3698
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 1.9 MW | 1.9 MW | 1958 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Utah
| Granite | Hydro | 2.0 MW |
| Smithfield 3 | Solar | 2.0 MW |
| Brigham City | Hydro | 1.8 MW |
| Pine View Dam | Hydro | 1.8 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.9 MW solar plant and a 1.9 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Utah power plants · What Utah actually generates