South Milford Solar Plant
Solar power plant · Beaver County, Utah
Nameplate capacity
2.9 MW
Rank in Utah
#108
of 131 plants
In service since
2015
March 2015
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- REUT Origination, LLC
- County
- Beaver County
- Generating units
- 1
- Share of state capacity
- 0.03%
- Rank among solar plants in Utah
- #49 of 55
- EIA plant code
- 59620
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| SMS1 | Solar Photovoltaic | 2.9 MW | 2.9 MW | 2015 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Utah
| Quichapa 2 | Solar | 3.0 MW |
| Quichapa 3 | Solar | 3.0 MW |
| Hydro Plant No 3 | Hydro | 2.8 MW |
| Upper Beaver | Hydro | 2.5 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.9 MW solar plant and a 2.9 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Utah power plants · What Utah actually generates