Home / Power plants / Utah / SF Auto T1

SF Auto T1

Solar power plant · Box Elder County, Utah

Nameplate capacity
3.1 MW
Rank in Utah
#94
of 131 plants
In service since
2023
December 2023

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Autoliv ASP, Inc.
County
Box Elder County
Generating units
1
Share of state capacity
0.03%
Rank among solar plants in Utah
#35 of 55
EIA plant code
67238

Generating units

Individual generating units at SF Auto T1
UnitTechnologyNameplateSummerOnlineStatus
SFAT1Solar Photovoltaic3.1 MW3.1 MW2023Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Utah

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 3.1 MW solar plant and a 3.1 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Utah power plants · What Utah actually generates