Home / Power plants / Utah / Pavant Solar III

Pavant Solar III

Solar power plant · Millard County, Utah

Nameplate capacity
20 MW
Rank in Utah
#59
of 131 plants
In service since
2016
December 2016

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Invenergy Services LLC
County
Millard County
Generating units
1
Share of state capacity
0.17%
Rank among solar plants in Utah
#31 of 55
EIA plant code
60886

Generating units

Individual generating units at Pavant Solar III
UnitTechnologyNameplateSummerOnlineStatus
PSIIISolar Photovoltaic20 MW20 MW2016Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Utah

WhiteheadNatural gas27 MW
Cove FortOther25 MW
Spanish Fork Wind Park 2 LLCWind19 MW
Heber CityNatural gas18 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 20 MW solar plant and a 20 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Utah power plants · What Utah actually generates