Pavant Solar II LLC
Solar power plant · Millard County, Utah
Nameplate capacity
50 MW
Rank in Utah
#47
of 131 plants
In service since
2016
November 2016
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Pavant Solar II LLC
- County
- Millard County
- Generating units
- 1
- Share of state capacity
- 0.44%
- Rank among solar plants in Utah
- #27 of 55
- EIA plant code
- 60449
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| PSII | Solar Photovoltaic | 50 MW | 50 MW | 2016 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Utah
| Sage Solar I-III | Solar | 58 MW |
| Granite Mountain Solar West, LLC | Solar | 50 MW |
| Pavant Solar, LLC | Solar | 50 MW |
| Murray Turbine | Natural gas | 42 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 50 MW solar plant and a 50 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Utah power plants · What Utah actually generates