Milford Wind Corridor I LLC
Wind power plant · Beaver County, Utah
Nameplate capacity
204 MW
Rank in Utah
#10
of 131 plants
In service since
2009
September 2009
Details
- Primary fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- Milford Wind Corridor Phase I, LLC (Longroad)
- County
- Beaver County
- Generating units
- 1
- Share of state capacity
- 1.77%
- Rank among wind plants in Utah
- #1 of 5
- EIA plant code
- 57079
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 204 MW | 204 MW | 2009 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Utah
| Gadsby | Natural gas | 433 MW |
| West Valley Generation Project | Natural gas | 217 MW |
| Appaloosa Solar I | Solar | 200 MW |
| Dominguez Energy Storage | Battery storage | 200 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 204 MW solar plant and a 204 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Utah power plants · What Utah actually generates