Home / Power plants / Utah / Hunter Solar LLC (UT)

Hunter Solar LLC (UT)

Solar power plant · Emery County, Utah

Nameplate capacity
100 MW
Rank in Utah
#19
of 131 plants
In service since
2021
March 2021

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Hunter Solar LLC
County
Emery County
Generating units
1
Share of state capacity
0.87%
Rank among solar plants in Utah
#6 of 55
EIA plant code
62656

Generating units

Individual generating units at Hunter Solar LLC (UT)
UnitTechnologyNameplateSummerOnlineStatus
HUSOLSolar Photovoltaic100 MW100 MW2021Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Utah

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 100 MW solar plant and a 100 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Utah power plants · What Utah actually generates