Hornshadow Solar II, LLC
Solar power plant · Emery County, Utah
Nameplate capacity
200 MW
Rank in Utah
#13
of 131 plants
In service since
2025
July 2025
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Hornshadow Solar II, LLC
- County
- Emery County
- Generating units
- 1
- Share of state capacity
- 1.74%
- Rank among solar plants in Utah
- #3 of 55
- EIA plant code
- 67511
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| HS2L | Solar Photovoltaic | 200 MW | 200 MW | 2025 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Utah
| Appaloosa Solar I | Solar | 200 MW |
| Dominguez Energy Storage | Battery storage | 200 MW |
| Flaming Gorge | Hydro | 152 MW |
| Nebo Power Station | Natural gas | 140 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 200 MW solar plant and a 200 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Utah power plants · What Utah actually generates