Home / Power plants / Utah / Graphite Solar I

Graphite Solar I

Solar power plant · Carbon County, Utah

Nameplate capacity
80 MW
Rank in Utah
#31
of 131 plants
In service since
2022
June 2022

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Greenbacker Renewable Energy Corporation
County
Carbon County
Generating units
1
Share of state capacity
0.70%
Rank among solar plants in Utah
#15 of 55
EIA plant code
64186

Generating units

Individual generating units at Graphite Solar I
UnitTechnologyNameplateSummerOnlineStatus
394Solar Photovoltaic80 MW80 MW2022Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Utah

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 80 MW solar plant and a 80 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Utah power plants · What Utah actually generates