Home / Power plants / Utah / Escalante BESS I

Escalante BESS I

Battery storage power plant · Beaver County, Utah

Nameplate capacity
80 MW
Rank in Utah
#25
of 131 plants
In service since
2026
April 2026

Details

Primary fuel
Battery storage
Technology
Batteries
Operator
County
Beaver County
Generating units
1
Share of state capacity
0.70%
Rank among battery storage plants in Utah
#3 of 5
EIA plant code
69677

Generating units

Individual generating units at Escalante BESS I
UnitTechnologyNameplateSummerOnlineStatus
ESCBABatteries80 MW80 MW2026Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Utah

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 80 MW solar plant and a 80 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Utah power plants · What Utah actually generates