SR Forked Deer
Solar power plant · Lauderdale County, Tennessee
Nameplate capacity
2.5 MW
Rank in Tennessee
#95
of 106 plants
In service since
2025
November 2025
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- SR Forked Deer, LLC
- County
- Lauderdale County
- Generating units
- 1
- Share of state capacity
- 0.01%
- Rank among solar plants in Tennessee
- #41 of 52
- EIA plant code
- 68102
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| FDEER | Solar Photovoltaic | 2.5 MW | 2.5 MW | 2025 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Tennessee
| SR Brownsville | Solar | 3.0 MW |
| Chattanooga Metropolitan Airport Solar | Solar | 2.5 MW |
| SR Trenton | Solar | 2.3 MW |
| Somerville Solar | Solar | 2.3 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.5 MW solar plant and a 2.5 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Tennessee power plants · What Tennessee actually generates