Home / Power plants / Tennessee / Providence Solar

Providence Solar

Solar power plant · Madison County, Tennessee

Nameplate capacity
16 MW
Rank in Tennessee
#56
of 106 plants
In service since
2017
October 2017

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Providence Solar Center, LLC
County
Madison County
Generating units
1
Share of state capacity
0.07%
Rank among solar plants in Tennessee
#10 of 52
EIA plant code
60337

Generating units

Individual generating units at Providence Solar
UnitTechnologyNameplateSummerOnlineStatus
PROVSolar Photovoltaic16 MW16 MW2017Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Tennessee

Ocoee 1Hydro19 MW
Vanderbilt University Power PlantNatural gas19 MW
SR Canadaville, LLCSolar16 MW
Selmer ISolar16 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 16 MW solar plant and a 16 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Tennessee power plants · What Tennessee actually generates