Home / Power plants / Tennessee / Primient Loudon Plant

Primient Loudon Plant

Natural gas power plant · Loudon County, Tennessee

Nameplate capacity
61 MW
Rank in Tennessee
#37
of 106 plants
In service since
2016
October 2016

Details

Primary fuel
Natural gas
Technology
Natural Gas Fired Combustion Turbine
Operator
PRIMIENT, LLC
County
Loudon County
Generating units
2
Share of state capacity
0.26%
Rank among natural gas plants in Tennessee
#7 of 12
EIA plant code
63632

Generating units

Individual generating units at Primient Loudon Plant
UnitTechnologyNameplateSummerOnlineStatus
Y9111Natural Gas Fired Combustion Turbine31 MW26 MW2016Operating
Y9121Natural Gas Fired Combustion Turbine31 MW26 MW2016Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Tennessee

Melton HillHydro72 MW
SR McKellarSolar70 MW
Fort Patrick HenryHydro59 MW
WataugaHydro58 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 61 MW solar plant and a 61 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Tennessee power plants · What Tennessee actually generates