Wild Springs

Solar power plant · Pennington County, South Dakota

Nameplate capacity
128 MW
Rank in South Dakota
#23
of 54 plants
In service since
2024
June 2024

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Geronimo Power
County
Pennington County
Generating units
1
Share of state capacity
1.67%
Rank among solar plants in South Dakota
#1 of 4
EIA plant code
67018

Generating units

Individual generating units at Wild Springs
UnitTechnologyNameplateSummerOnlineStatus
WLDSPSolar Photovoltaic128 MW128 MW2024Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in South Dakota

Dakota Range III Wind ProjectWind154 MW
Spirit MoundOther135 MW
Aberdeen CTNatural gas111 MW
Ben FrenchNatural gas110 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 128 MW solar plant and a 128 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All South Dakota power plants · What South Dakota actually generates