Home / Power plants / South Dakota / Triple H Wind Project

Triple H Wind Project

Wind power plant · Hyde County, South Dakota

Nameplate capacity
250 MW
Rank in South Dakota
#10
of 54 plants
In service since
2020
November 2020

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
Engie North America
County
Hyde County
Generating units
1
Share of state capacity
3.26%
Rank among wind plants in South Dakota
#3 of 25
EIA plant code
63103

Generating units

Individual generating units at Triple H Wind Project
UnitTechnologyNameplateSummerOnlineStatus
WTGOnshore Wind Turbine250 MW250 MW2020Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in South Dakota

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 250 MW solar plant and a 250 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All South Dakota power plants · What South Dakota actually generates