WED Coventry 2
Wind power plant · Kent County, Rhode Island
Nameplate capacity
4.5 MW
Rank in Rhode Island
#43
of 110 plants
In service since
2016
August 2016
Details
- Primary fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- WED Coventry Two, LLC
- County
- Kent County
- Generating units
- 3
- Share of state capacity
- 0.18%
- Rank among wind plants in Rhode Island
- #3 of 19
- EIA plant code
- 59302
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| COV2 | Onshore Wind Turbine | 1.5 MW | 1.5 MW | 2016 | Operating |
| COV2A | Onshore Wind Turbine | 1.5 MW | 1.5 MW | 2016 | Operating |
| COV2B | Onshore Wind Turbine | 1.5 MW | 1.5 MW | 2016 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Rhode Island
| Manville Hill Road Solar | Solar | 4.5 MW |
| NBC Field's Point Wind Farm | Wind | 4.5 MW |
| WED Coventry 6 | Wind | 4.5 MW |
| Woodville Solar (CSG) | Solar | 4.5 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 4.5 MW solar plant and a 4.5 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Rhode Island power plants · What Rhode Island actually generates