Home / Power plants / Rhode Island / Howard Lane Solar

Howard Lane Solar

Solar power plant · Providence County, Rhode Island

Nameplate capacity
3.0 MW
Rank in Rhode Island
#61
of 110 plants
In service since
2023
September 2023

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
NJR Clean Energy Ventures Corporation
County
Providence County
Generating units
1
Share of state capacity
0.12%
Rank among solar plants in Rhode Island
#44 of 75
EIA plant code
65386

Generating units

Individual generating units at Howard Lane Solar
UnitTechnologyNameplateSummerOnlineStatus
HOWRDSolar Photovoltaic3.0 MW3.0 MW2023Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Rhode Island

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 3.0 MW solar plant and a 3.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Rhode Island power plants · What Rhode Island actually generates