Home / Power plants / Rhode Island / Bristol Landfill Solar

Bristol Landfill Solar

Solar power plant · Bristol County, Rhode Island

Nameplate capacity
5.0 MW
Rank in Rhode Island
#34
of 110 plants
In service since
2024
March 2024

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
NuGen Capital Management
County
Bristol County
Generating units
1
Share of state capacity
0.19%
Rank among solar plants in Rhode Island
#22 of 75
EIA plant code
65142

Generating units

Individual generating units at Bristol Landfill Solar
UnitTechnologyNameplateSummerOnlineStatus
BL1Solar Photovoltaic5.0 MW5.0 MW2024Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Rhode Island

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 5.0 MW solar plant and a 5.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Rhode Island power plants · What Rhode Island actually generates