Townsend Hydro
Hydro power plant · Beaver County, Pennsylvania
Details
- Primary fuel
- Hydro
- Technology
- Conventional Hydroelectric
- Operator
- Beaver Falls Municipal Auth
- County
- Beaver County
- Generating units
- 2
- Share of state capacity
- 0.01%
- Rank among hydro plants in Pennsylvania
- #17 of 19
- EIA plant code
- 10285
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| GEN1 | Conventional Hydroelectric | 2.6 MW | 2.1 MW | 1987 | Operating |
| GEN2 | Conventional Hydroelectric | 2.6 MW | 2.1 MW | 1987 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Pennsylvania
| Schuylkill Haven PA BTM | Other | 5.4 MW |
| Weatherly(PA) RTO BTM | Other | 5.4 MW |
| Keystone Solar | Solar | 5.0 MW |
| Vitro Architectural Glass (PA) | Other | 5.0 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 5.2 MW solar plant and a 5.2 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Pennsylvania power plants · What Pennsylvania actually generates