Home / Power plants / Pennsylvania / PA Solar Park II

PA Solar Park II

Solar power plant · Carbon County, Pennsylvania

Nameplate capacity
10 MW
Rank in Pennsylvania
#177
of 273 plants
In service since
2020
January 2020

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
RWE Clean Energy
County
Carbon County
Generating units
1
Share of state capacity
0.02%
Rank among solar plants in Pennsylvania
#33 of 75
EIA plant code
63520

Generating units

Individual generating units at PA Solar Park II
UnitTechnologyNameplateSummerOnlineStatus
PASP2Solar Photovoltaic10 MW10 MW2020Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Pennsylvania

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 10 MW solar plant and a 10 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Pennsylvania power plants · What Pennsylvania actually generates