Locust Ridge II LLC
Wind power plant · Schuylkill County, Pennsylvania
Details
- Primary fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- Avangrid Power LLC
- County
- Schuylkill County
- Generating units
- 1
- Share of state capacity
- 0.19%
- Rank among wind plants in Pennsylvania
- #3 of 27
- EIA plant code
- 56770
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 102 MW | 102 MW | 2009 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Pennsylvania
| Colver Green Energy | Coal | 118 MW |
| Pixelle Specialty Solutions LLC - Spring | Coal | 104 MW |
| Armenia Mountain Wind Farm | Wind | 101 MW |
| Aspen Road Solar | Solar | 100 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 102 MW solar plant and a 102 MW nuclear plant have the same entry here and produce very different amounts of electricity.