Nameplate capacity
25 MW
Rank in Oregon
#77
of 301 plants
In service since
1998
August 1998
Details
- Primary fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- ESI Vansycle Partners LP
- County
- Umatilla County
- Generating units
- 1
- Share of state capacity
- 0.13%
- Rank among wind plants in Oregon
- #26 of 50
- EIA plant code
- 55125
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| WGNS | Onshore Wind Turbine | 25 MW | 25 MW | 1998 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Oregon
| Clearwater 2 | Hydro | 26 MW |
| Cougar | Hydro | 26 MW |
| Klondike Wind Power | Wind | 25 MW |
| PHP 1 | Hydro | 24 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 25 MW solar plant and a 25 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Oregon power plants · What Oregon actually generates