Home / Power plants / Oregon / Sundial (Troutdale) BESS

Sundial (Troutdale) BESS

Battery storage power plant · Multnomah County, Oregon

Nameplate capacity
200 MW
Rank in Oregon
#25
of 301 plants
In service since
2024
December 2024

Details

Primary fuel
Battery storage
Technology
Batteries
Operator
Troutdale Grid, LLC
County
Multnomah County
Generating units
1
Share of state capacity
1.04%
Rank among battery storage plants in Oregon
#2 of 4
EIA plant code
67869

Generating units

Individual generating units at Sundial (Troutdale) BESS
UnitTechnologyNameplateSummerOnlineStatus
BTDBatteries200 MW200 MW2024Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Oregon

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 200 MW solar plant and a 200 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Oregon power plants · What Oregon actually generates