Solar Star Oregon II
Solar power plant · Crook County, Oregon
Nameplate capacity
56 MW
Rank in Oregon
#55
of 301 plants
In service since
2017
October 2017
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Avangrid Power LLC
- County
- Crook County
- Generating units
- 1
- Share of state capacity
- 0.29%
- Rank among solar plants in Oregon
- #7 of 148
- EIA plant code
- 61048
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| PV1 | Solar Photovoltaic | 56 MW | 56 MW | 2017 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Oregon
| Skysol | Solar | 61 MW |
| Bakeoven Solar | Solar | 60 MW |
| Dillard Complex | Other | 52 MW |
| Oak Grove | Hydro | 51 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 56 MW solar plant and a 56 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Oregon power plants · What Oregon actually generates