Home / Power plants / Oregon / Sesqui-C Solar (CSG)

Sesqui-C Solar (CSG)

Solar power plant · Yamhill County, Oregon

Nameplate capacity
2.5 MW
Rank in Oregon
#221
of 301 plants
In service since
2022
December 2022

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Sesqui-C Solar, LLC
County
Yamhill County
Generating units
1
Share of state capacity
0.01%
Rank among solar plants in Oregon
#84 of 148
EIA plant code
65751

Generating units

Individual generating units at Sesqui-C Solar (CSG)
UnitTechnologyNameplateSummerOnlineStatus
SC22Solar Photovoltaic2.5 MW2.5 MW2022Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Oregon

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.5 MW solar plant and a 2.5 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Oregon power plants · What Oregon actually generates