Rodeo Solar LLC (OR)
Solar power plant · Clackamas County, Oregon
Nameplate capacity
2.3 MW
Rank in Oregon
#230
of 303 plants
In service since
2025
November 2025
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- —
- County
- Clackamas County
- Generating units
- 1
- Share of state capacity
- 0.01%
- Rank among solar plants in Oregon
- #94 of 151
- EIA plant code
- 70411
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 3000 | Solar Photovoltaic | 2.3 MW | 2.3 MW | 2025 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Oregon
| Orchard Knob | Solar | 2.3 MW |
| Palmer Creek Solar, LLC | Solar | 2.3 MW |
| Steel Bridge Solar, LLC | Solar | 2.3 MW |
| Sunset Ridge Solar (CSG) | Solar | 2.3 MW |
About this data
From EIA’s inventory of operable generators, August 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.3 MW solar plant and a 2.3 MW nuclear plant have the same entry here and produce very different amounts of electricity.