OR - Green Key - Marquam
Solar power plant · Clackamas County, Oregon
Nameplate capacity
1.9 MW
Rank in Oregon
#269
of 301 plants
In service since
2024
December 2024
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Canyonland Solar LLC
- County
- Clackamas County
- Generating units
- 1
- Share of state capacity
- 0.01%
- Rank among solar plants in Oregon
- #131 of 148
- EIA plant code
- 68446
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| MARQM | Solar Photovoltaic | 1.9 MW | 1.9 MW | 2024 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Oregon
| SSD Marion 5, LLC | Solar | 2.0 MW |
| SSD Marion 6, LLC | Solar | 2.0 MW |
| River Valley Solar | Solar | 1.9 MW |
| Sandy River Solar (CSG) | Solar | 1.9 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.9 MW solar plant and a 1.9 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Oregon power plants · What Oregon actually generates