Home / Power plants / Oregon / Fruitland Creek Solar (CSG)

Fruitland Creek Solar (CSG)

Solar power plant · Marion County, Oregon

Nameplate capacity
1.8 MW
Rank in Oregon
#274
of 301 plants
In service since
2022
December 2022

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Fruitland Creek Solar, LLC
County
Marion County
Generating units
1
Share of state capacity
0.01%
Rank among solar plants in Oregon
#136 of 148
EIA plant code
65747

Generating units

Individual generating units at Fruitland Creek Solar (CSG)
UnitTechnologyNameplateSummerOnlineStatus
FC22Solar Photovoltaic1.8 MW1.8 MW2022Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Oregon

Tickle Creek SolarSolar1.9 MW
Dunn Road SolarSolar1.8 MW
Peters Drive PlantHydro1.8 MW
Big Top LLCWind1.7 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.8 MW solar plant and a 1.8 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Oregon power plants · What Oregon actually generates