Home / Power plants / Oregon / Eurus Combine Hills Turbine Ranch 2

Eurus Combine Hills Turbine Ranch 2

Wind power plant · Umatilla County, Oregon

Nameplate capacity
66 MW
Rank in Oregon
#52
of 301 plants
In service since
2010
January 2010

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
Eurus Combine Hills II LLC
County
Umatilla County
Generating units
1
Share of state capacity
0.34%
Rank among wind plants in Oregon
#23 of 50
EIA plant code
57137

Generating units

Individual generating units at Eurus Combine Hills Turbine Ranch 2
UnitTechnologyNameplateSummerOnlineStatus
1Onshore Wind Turbine66 MW62 MW2010Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Oregon

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 66 MW solar plant and a 66 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Oregon power plants · What Oregon actually generates