Nameplate capacity
47 MW
Rank in Oregon
#60
of 301 plants
In service since
2019
December 2019
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Airport Solar LLC
- County
- Lake County
- Generating units
- 1
- Share of state capacity
- 0.25%
- Rank among solar plants in Oregon
- #8 of 148
- EIA plant code
- 62560
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| APS | Solar Photovoltaic | 47 MW | 47 MW | 2019 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Oregon
| Condon Windpower LLC | Wind | 50 MW |
| Lost Creek | Hydro | 49 MW |
| Cartwright Solar I | Solar | 44 MW |
| Lemolo 2 | Hydro | 44 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 47 MW solar plant and a 47 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Oregon power plants · What Oregon actually generates