Home / Power plants / Oklahoma / Tri County - TenK

Tri County - TenK

Solar power plant · Texas County, Oklahoma

Nameplate capacity
1.0 MW
Rank in Oklahoma
#147
of 147 plants
In service since
2016
April 2016

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Today's Power, Inc.
County
Texas County
Generating units
1
Share of state capacity
0.00%
Rank among solar plants in Oklahoma
#17 of 17
EIA plant code
68725

Generating units

Individual generating units at Tri County - TenK
UnitTechnologyNameplateSummerOnlineStatus
TRICOSolar Photovoltaic1.0 MW1.0 MW2016Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Oklahoma

Pine RidgeSolar3.0 MW
Norman SolarSolar2.0 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.0 MW solar plant and a 1.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Oklahoma power plants · What Oklahoma actually generates