Traverse Wind Project, LLC

Wind power plant · Custer County, Oklahoma

Nameplate capacity
999 MW
Rank in Oklahoma
#11
of 147 plants
In service since
2022
April 2022

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
Southwestern Electric Power Co
County
Custer County
Generating units
1
Share of state capacity
2.74%
Rank among wind plants in Oklahoma
#1 of 70
EIA plant code
63479

Generating units

Individual generating units at Traverse Wind Project, LLC
UnitTechnologyNameplateSummerOnlineStatus
GEN1Onshore Wind Turbine999 MW999 MW2022Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Oklahoma

Riverside (OK)Natural gas1,122 MW
ChouteauNatural gas1,070 MW
Green Country Power StationNatural gas904 MW
Skeleton Creek Energy Center HybridBattery storage752 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 999 MW solar plant and a 999 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Oklahoma power plants · What Oklahoma actually generates