Ponderosa Wind II
Wind power plant · Beaver County, Oklahoma
Nameplate capacity
100 MW
Rank in Oklahoma
#95
of 147 plants
In service since
2024
December 2024
Details
- Primary fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- Ponderosa Wind II, LLC
- County
- Beaver County
- Generating units
- 1
- Share of state capacity
- 0.27%
- Rank among wind plants in Oklahoma
- #57 of 70
- EIA plant code
- 66155
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| GP01 | Onshore Wind Turbine | 100 MW | 100 MW | 2024 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Oklahoma
| Broken Bow Dam | Hydro | 100 MW |
| Kiowa County Solar Project | Solar | 100 MW |
| Wildhorse Mountain Wind Facility | Wind | 100 MW |
| Blue Canyon Windpower VI LLC | Wind | 100 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 100 MW solar plant and a 100 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Oklahoma power plants · What Oklahoma actually generates