Home / Power plants / Oklahoma / Drift Sand Wind Project LLC

Drift Sand Wind Project LLC

Wind power plant · Grady County, Oklahoma

Nameplate capacity
108 MW
Rank in Oklahoma
#87
of 147 plants
In service since
2016
December 2016

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
Enel Green Power NA, Inc.
County
Grady County
Generating units
1
Share of state capacity
0.30%
Rank among wind plants in Oklahoma
#51 of 70
EIA plant code
59065

Generating units

Individual generating units at Drift Sand Wind Project LLC
UnitTechnologyNameplateSummerOnlineStatus
WT1Onshore Wind Turbine108 MW108 MW2016Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Oklahoma

Robert S KerrHydro110 MW
WeleetkaNatural gas110 MW
Oklahoma Wind Energy CenterWind102 MW
OU Spirit Wind FarmWind101 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 108 MW solar plant and a 108 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Oklahoma power plants · What Oklahoma actually generates