Home / Power plants / Ohio / Ross County Solar, LLC

Ross County Solar, LLC

Solar power plant · Ross County, Ohio

Nameplate capacity
120 MW
Rank in Ohio
#51
of 219 plants
In service since
2025
January 2025

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Geronimo Power
County
Ross County
Generating units
1
Share of state capacity
0.34%
Rank among solar plants in Ohio
#16 of 76
EIA plant code
65343

Generating units

Individual generating units at Ross County Solar, LLC
UnitTechnologyNameplateSummerOnlineStatus
ROSSSolar Photovoltaic120 MW120 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Ohio

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 120 MW solar plant and a 120 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Ohio power plants · What Ohio actually generates