Great Bend Solar Project
Solar power plant · Meigs County, Ohio
Nameplate capacity
48 MW
Rank in Ohio
#80
of 219 plants
In service since
2025
December 2025
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Great Bend Solar LLC
- County
- Meigs County
- Generating units
- 1
- Share of state capacity
- 0.13%
- Rank among solar plants in Ohio
- #30 of 76
- EIA plant code
- 67834
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| GBSP1 | Solar Photovoltaic | 48 MW | 48 MW | 2025 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Ohio
| Napoleon Peaking Station | Natural gas | 50 MW |
| Montpelier Solar Project | Solar | 49 MW |
| Racine | Hydro | 47 MW |
| Central Utility Plant Cincinnati | Natural gas | 47 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 48 MW solar plant and a 48 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Ohio power plants · What Ohio actually generates