Fox Squirrel Solar
Solar power plant · Madison County, Ohio
Nameplate capacity
577 MW
Rank in Ohio
#23
of 219 plants
In service since
2023
December 2023
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- EDF Renewable Asset Holdings, Inc.
- County
- Madison County
- Generating units
- 1
- Share of state capacity
- 1.61%
- Rank among solar plants in Ohio
- #1 of 76
- EIA plant code
- 67239
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| FOX01 | Solar Photovoltaic | 577 MW | 577 MW | 2023 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Ohio
| Dresden Energy Facility | Natural gas | 678 MW |
| Robert P Mone Plant | Natural gas | 597 MW |
| Woodsdale | Natural gas | 572 MW |
| Darby Power, LLC | Natural gas | 564 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 577 MW solar plant and a 577 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Ohio power plants · What Ohio actually generates