Home / Power plants / Ohio / FirstEnergy Bay Shore

FirstEnergy Bay Shore

Other power plant · Lucas County, Ohio

Nameplate capacity
187 MW
Rank in Ohio
#40
of 219 plants
In service since
1955
August 1955

Details

Primary fuel
Other
Technology
Petroleum Coke
Operator
Walleye Power, LLC
County
Lucas County
Generating units
2
Share of state capacity
0.52%
Rank among other plants in Ohio
#1 of 53
EIA plant code
2878

Generating units

Individual generating units at FirstEnergy Bay Shore
UnitTechnologyNameplateSummerOnlineStatus
1Petroleum Coke171 MW140 MW1955Operating
CTPetroleum Liquids16 MW14 MW1967Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Ohio

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 187 MW solar plant and a 187 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Ohio power plants · What Ohio actually generates