Clyde Solar Array
Solar power plant · Sandusky County, Ohio
Nameplate capacity
2.8 MW
Rank in Ohio
#169
of 219 plants
In service since
2016
June 2016
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Onsite Partners, LLC
- County
- Sandusky County
- Generating units
- 1
- Share of state capacity
- 0.01%
- Rank among solar plants in Ohio
- #50 of 76
- EIA plant code
- 60923
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| PV1 | Solar Photovoltaic | 2.8 MW | 2.8 MW | 2016 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Ohio
| Ohio Northern University Solar Site | Solar | 3.0 MW |
| Valfilm Wind Project | Wind | 3.0 MW |
| Jackson Pike WWTP Cogen Engines | Other | 2.8 MW |
| Napoleon Biogas | Other | 2.8 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.8 MW solar plant and a 2.8 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Ohio power plants · What Ohio actually generates