Home / Power plants / North Dakota / Oliver Wind IV

Oliver Wind IV

Wind power plant · Oliver County, North Dakota

Nameplate capacity
199 MW
Rank in North Dakota
#16
of 63 plants
In service since
2024
December 2024

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
Oliver Wind IV, LLC
County
Oliver County
Generating units
1
Share of state capacity
1.77%
Rank among wind plants in North Dakota
#8 of 42
EIA plant code
67502

Generating units

Individual generating units at Oliver Wind IV
UnitTechnologyNameplateSummerOnlineStatus
GEN4Onshore Wind Turbine199 MW199 MW2024Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in North Dakota

Emmons-Logan Wind, LLCWind200 MW
Burke Wind, LLCWind199 MW
Tatanka Wind Power LLCWind180 MW
R M HeskettNatural gas178 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 199 MW solar plant and a 199 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All North Dakota power plants · What North Dakota actually generates