FPL Energy North Dakota Wind I/II
Wind power plant · LaMoure County, North Dakota
Nameplate capacity
62 MW
Rank in North Dakota
#41
of 63 plants
In service since
2003
October 2003
Details
- Primary fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- FPL Energy North Dakota Wind LLC
- County
- LaMoure County
- Generating units
- 1
- Share of state capacity
- 0.55%
- Rank among wind plants in North Dakota
- #31 of 42
- EIA plant code
- 56099
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| GE15 | Onshore Wind Turbine | 62 MW | 62 MW | 2003 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in North Dakota
| Bison I Wind Energy Center | Wind | 82 MW |
| Ashtabula Wind III LLC | Wind | 62 MW |
| FPL Energy Oliver Wind I LLC | Wind | 51 MW |
| FPL Energy Burleigh County Wind | Wind | 50 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 62 MW solar plant and a 62 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All North Dakota power plants · What North Dakota actually generates