Foxtail Wind, LLC

Wind power plant · Dickey County, North Dakota

Nameplate capacity
150 MW
Rank in North Dakota
#23
of 63 plants
In service since
2020
January 2020

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
Foxtail Wind, LLC
County
Dickey County
Generating units
1
Share of state capacity
1.34%
Rank among wind plants in North Dakota
#14 of 42
EIA plant code
61747

Generating units

Individual generating units at Foxtail Wind, LLC
UnitTechnologyNameplateSummerOnlineStatus
1Onshore Wind Turbine150 MW150 MW2020Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in North Dakota

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 150 MW solar plant and a 150 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All North Dakota power plants · What North Dakota actually generates