Timbermill Wind, LLC
Wind power plant · Chowan County, North Carolina
Details
- Primary fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- Timbermill Wind
- County
- Chowan County
- Generating units
- 1
- Share of state capacity
- 0.47%
- Rank among wind plants in North Carolina
- #2 of 2
- EIA plant code
- 67910
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| TIMBY | Onshore Wind Turbine | 189 MW | 189 MW | 2024 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in North Carolina
| Fontana Dam | Hydro | 255 MW |
| Desert Wind Farm, LLC | Wind | 208 MW |
| Rosemary Power Station | Other | 180 MW |
| Gaston | Hydro | 178 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 189 MW solar plant and a 189 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All North Carolina power plants · What North Carolina actually generates