Home / Power plants / North Carolina / Melinda Solar

Melinda Solar

Solar power plant · Vance County, North Carolina

Nameplate capacity
5.0 MW
Rank in North Carolina
#403
of 930 plants
In service since
2015
August 2015

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Cypress Creek Renewables
County
Vance County
Generating units
1
Share of state capacity
0.01%
Rank among solar plants in North Carolina
#308 of 758
EIA plant code
59502

Generating units

Individual generating units at Melinda Solar
UnitTechnologyNameplateSummerOnlineStatus
PV1Solar Photovoltaic5.0 MW5.0 MW2015Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in North Carolina

McKinney BESSBattery storage5.0 MW
Meadowbrook Solar FarmSolar5.0 MW
Meriwether FarmSolar5.0 MW
Mile FarmSolar5.0 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 5.0 MW solar plant and a 5.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All North Carolina power plants · What North Carolina actually generates