Home / Power plants / North Carolina / Mariposa Solar Center LLC

Mariposa Solar Center LLC

Solar power plant · Gaston County, North Carolina

Nameplate capacity
5.0 MW
Rank in North Carolina
#393
of 930 plants
In service since
2016
September 2016

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Heelstone Energy Holdings, LLC
County
Gaston County
Generating units
1
Share of state capacity
0.01%
Rank among solar plants in North Carolina
#301 of 758
EIA plant code
59162

Generating units

Individual generating units at Mariposa Solar Center LLC
UnitTechnologyNameplateSummerOnlineStatus
MSC 1Solar Photovoltaic5.0 MW5.0 MW2016Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in North Carolina

Manning PV 1Solar5.0 MW
Manway Solar FarmSolar5.0 MW
Marshall DamHydro5.0 MW
Marshville FarmSolar5.0 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 5.0 MW solar plant and a 5.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All North Carolina power plants · What North Carolina actually generates