Innovative Solar 67
Solar power plant · Pender County, North Carolina
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- John Laing US Solar Corp.
- County
- Pender County
- Generating units
- 1
- Share of state capacity
- 0.08%
- Rank among solar plants in North Carolina
- #50 of 758
- EIA plant code
- 59678
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| IS067 | Solar Photovoltaic | 33 MW | 33 MW | 2018 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in North Carolina
| Lumberton | Other | 35 MW |
| Innovative Solar 47 | Solar | 34 MW |
| High Rock Hydro | Hydro | 33 MW |
| Univ of NC Chapel Hill Cogen Facility | Coal | 32 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 33 MW solar plant and a 33 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All North Carolina power plants · What North Carolina actually generates