Home / Power plants / North Carolina / Five Forks Solar

Five Forks Solar

Solar power plant · Warren County, North Carolina

Nameplate capacity
20 MW
Rank in North Carolina
#125
of 930 plants
In service since
2019
December 2019

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Five Forks Solar
County
Warren County
Generating units
1
Share of state capacity
0.05%
Rank among solar plants in North Carolina
#64 of 758
EIA plant code
59951

Generating units

Individual generating units at Five Forks Solar
UnitTechnologyNameplateSummerOnlineStatus
5FRKSolar Photovoltaic20 MW20 MW2019Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in North Carolina

Cork Oak SolarSolar20 MW
Dogwood Solar, LLCSolar20 MW
Grandy PV 1Solar20 MW
Halifax (NC)Solar20 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 20 MW solar plant and a 20 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All North Carolina power plants · What North Carolina actually generates