Collier BESS
Battery storage power plant · Cumberland County, North Carolina
Details
- Primary fuel
- Battery storage
- Technology
- Batteries
- Operator
- North Carolina El Member Corp
- County
- Cumberland County
- Generating units
- 1
- Share of state capacity
- 0.01%
- Rank among battery storage plants in North Carolina
- #26 of 34
- EIA plant code
- 65248
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| BAT1 | Batteries | 2.5 MW | 2.5 MW | 2024 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in North Carolina
| Thunderhead | Solar | 2.6 MW |
| CBC Solar Energy Gen Fac Phase 2 | Solar | 2.5 MW |
| Davistown-Mercer | Battery storage | 2.5 MW |
| Granville Solar PV Power Project | Solar | 2.5 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.5 MW solar plant and a 2.5 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All North Carolina power plants · What North Carolina actually generates