Brighter Future Solar

Solar power plant · Caldwell County, North Carolina

Nameplate capacity
11 MW
Rank in North Carolina
#162
of 930 plants
In service since
2022
January 2022

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Brighter Future Solar LLC
County
Caldwell County
Generating units
1
Share of state capacity
0.03%
Rank among solar plants in North Carolina
#95 of 758
EIA plant code
64910

Generating units

Individual generating units at Brighter Future Solar
UnitTechnologyNameplateSummerOnlineStatus
BFSNCSolar Photovoltaic11 MW11 MW2022Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in North Carolina

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 11 MW solar plant and a 11 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All North Carolina power plants · What North Carolina actually generates